A well executed project thanks to Edward Scammel project manager at Sarah constructions along with the supervisors from Sarah’s Jeremy Elvin and Ian Mcknight many thanks to Daryl Curyer project manager Master Lining this project required feature perforated plywood which Daryl provided shop drawings for and each individual panel was brought to site to the mm the project also had Armstrong Peakform grid along with Armstrong Metalworks ceiling tiles supplied by Total Building Systems thanks to all who were involved.